Incorporating Climate Variability into Water Balance Modelling to Help Inform Water Management Design: The Pebble Mine Project

Incorporating Climate Variability into Water Balance Modelling to Help Inform Water Management Design: The Pebble Mine Project

Author: Alana Shewan, Jaime Cathcart
Conference: Mine Water Solutions 2018
Date: June 12-15, 2018

ABSTRACT
Water plays a key role in the operation of mining projects, and it is essential that water management facilities be designed to manage the inflows and outflows required for proper operations, as well as accommodate any unpredictable runoff resulting from storms events. The amount of water available varies by year, season, and day, so how do you design for this? Establishing a predictive water balance model during the mine design stage is one of the most important considerations for minimizing water management problems during the operation and closure stages for a project. The water balance model needs to simulate mine operations under normal climate conditions and also under unusually wet and dry periods of varying durations. Key water management planning may be driven by the spring melt of a winter snowpack in cold regions, the variation in snowpack accumulation, and the timing of the freshet season.

The current industry standard for introducing climate variability into water balance modelling is to model monthly precipitation values as distributions, which are typically based on the mean and standard deviation values of historical monthly precipitation. The water balance model is then run for thousands of iterations using Monte Carlo simulation techniques to produce a large range of potential precipitation conditions and corresponding results. This procedure is effective, but it has a major shortcoming in that it simulates precipitation in every month as being completely independent of precipitation in any proceeding or following month. Areas that experience strong climate cycles resulting in extended dry or wet periods may not be correctly represented by this type of modelling.

This paper presents a case study for the proposed Pebble Mine project (Pebble) in Alaska and highlights the importance of a climate variable water balance model for informing the water management plan and design. The Pebble water balance model utilizes a 68-year monthly time-series of temperature and precipitation that was developed using a long-term regional dataset in combination with the extensive hydrometeorological dataset collected for Pebble. The time-series data were stepped through the model incrementally by year for the planned life of the project, thereby preserving the inherently cyclical nature of the climate record including wet and dry cycles, while creating 68 unique sets of water balance results for each month of each year of the project. The results were used to develop a robust water management strategy that supplies sufficient water to maintain full mine operations, even during prolonged dry periods, and maintains downstream flow requirements for aquatic habitat and resources.

 

Download the full technical paper.

Download

 

Recent Insights

April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation
February 2024
Empowerment and Resilience
January 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
January 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects
November 2023
Knight Piésold Commences with the ESIA for Haib Copper
November 2023
Insights from the Compilation and Critical Assessment of Breach and Runout Characteristics from Historical Tailings Dam Failures: Implications for Numerical Modelling
November 2023
Earthquake-induced Deformation Analysis of a TSF Undergoing Tailings Reprocessing
November 2023
Case Study: Approach to Determining the Risk Mitigation Priority of a Historic TSF in North America
October 2023
Data Management and Insights for Effective Tailings Storage Facility Management
October 2023
The Role of Sensitivity Analysis in Selecting Dam Breach Parameters
October 2023
Influence of Increased Confining Stress on Undrained Behavior of Tailings: A Case History at the Candelaria Mine
October 2023
The Re-use of Existing Bituminous Stabilised Materials for the Rehabilitation of National Route 7 - Case Study
September 2023
Transición energética para gerentes de mina
August 2023
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
July 2023
Selection of Soil Shear Strength Parameters Based on Integrated In Situ Tests, Lab Tests and Numerical Calibration Approach
June 2023
Leveraging Knowledge and Experience of a Well-Formed Independent Tailings Review Board to Enhance Tailings Facility Safety
May 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
February 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile