Neckartal Dam, the Design & Supply of the Hydro Mechanical Equipment

Neckartal Dam, the Design & Supply of the Hydro Mechanical Equipment

Author: Edwin Lillie, Guido Scalzi
Conference: AFRICA 2019
Date: April 2-4, 2019

Neckartal Dam is located on the Fish River, a tributary of the Orange River. The construction of Neckartal Dam started in September 2013. It will be the largest dam in Namibia and the eighth largest dam in Southern Africa by storage volume. Neckartal Dam is primarily for irrigation. Water is released from the dam and abstracted some 13km downstream from a weir. From there it is pumped to a balancing dam above the irrigation area. There is a mini hydropower station at the dam to generate electricity from the irrigation releases. Although the civil works make up the largest proportion of the capital cost of the project, the hydro mechanical equipment is vitally important to the success of the project. This paper gives a description of the hydro mechanical equipment for the project, the contractual arrangements to procure and install it, some of the important specifications used for the design and manufacture of the equipment and the quality assurance methods used to ensure that the equipment meets the long-term project requirements. Figure 1 shows the downstream view of the dam and outlet works taken from a drone.

 

Download the full technical paper.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence