Neckartal Dam, the Design & Supply of the Hydro Mechanical Equipment

Neckartal Dam, the Design & Supply of the Hydro Mechanical Equipment

Author: Edwin Lillie, Guido Scalzi
Conference: AFRICA 2019
Date: April 2-4, 2019

Neckartal Dam is located on the Fish River, a tributary of the Orange River. The construction of Neckartal Dam started in September 2013. It will be the largest dam in Namibia and the eighth largest dam in Southern Africa by storage volume. Neckartal Dam is primarily for irrigation. Water is released from the dam and abstracted some 13km downstream from a weir. From there it is pumped to a balancing dam above the irrigation area. There is a mini hydropower station at the dam to generate electricity from the irrigation releases. Although the civil works make up the largest proportion of the capital cost of the project, the hydro mechanical equipment is vitally important to the success of the project. This paper gives a description of the hydro mechanical equipment for the project, the contractual arrangements to procure and install it, some of the important specifications used for the design and manufacture of the equipment and the quality assurance methods used to ensure that the equipment meets the long-term project requirements. Figure 1 shows the downstream view of the dam and outlet works taken from a drone.

 

Download the full technical paper.

Download

Perspectivas recientes

Febrero 2024
Empoderamiento y Resiliencia
Enero 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
Enero 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects
Noviembre 2023
Knight Piésold Commences with the ESIA for Haib Copper
Noviembre 2023
Insights from the Compilation and Critical Assessment of Breach and Runout Characteristics from Historical Tailings Dam Failures: Implications for Numerical Modelling
Noviembre 2023
Earthquake-induced Deformation Analysis of a TSF Undergoing Tailings Reprocessing
Noviembre 2023
Case Study: Approach to Determining the Risk Mitigation Priority of a Historic TSF in North America
Octubre 2023
Data Management and Insights for Effective Tailings Storage Facility Management
Octubre 2023
The Role of Sensitivity Analysis in Selecting Dam Breach Parameters
Octubre 2023
Influence of Increased Confining Stress on Undrained Behavior of Tailings: A Case History at the Candelaria Mine
Octubre 2023
The Re-use of Existing Bituminous Stabilised Materials for the Rehabilitation of National Route 7 - Case Study
Septiembre 2023
Transición energética para gerentes de mina
Agosto 2023
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Julio 2023
Selection of Soil Shear Strength Parameters Based on Integrated In Situ Tests, Lab Tests and Numerical Calibration Approach
Junio 2023
Leveraging Knowledge and Experience of a Well-Formed Independent Tailings Review Board to Enhance Tailings Facility Safety
Mayo 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
Febrero 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile
Febrero 2023
Geotechnical Characterization of Collapsible Salty Sands Subjected to Monotonic and Cyclic Loadings – A Case Study for Areas with High Seismicity
Noviembre 2022
Application of the 3D Limit Equilibrium Method in Tailings Dam Breach Analysis
Noviembre 2022
Evaluation of Tailings Behaviour for Dam Breach Assessment