The Construction Supervision of Your First Category III Dam - Aspects All Young Engineers Should Know - The Neckartal Dam, Namibia

The Construction Supervision of Your First Category III Dam - Aspects All Young Engineers Should Know - The Neckartal Dam, Namibia

Author: GL Coetzee
Conference: SANCOLD Conference 2017
Date: November 15-17, 2017

ABSTRACT
Young engineers are well equipped with knowledge regarding the design, engineering, and construction of Category III dams, but require in-field experience to develop both their project and program management skills for such an undertaking. The figures and statistics of these large scale projects can be overwhelming and it can often take months for young engineers to find their feet during the construction phase of such a project. Upon completion, the Neckartal Dam will be the largest dam in Namibia, with nearly three times the volume of the Hardap Dam, currently the largest reservoir in the country. The multi-billion Namibian Dollar, Category III Neckartal dam will contribute significantly to the sustainable economic development of the //Kharas Region, southern Namibia. The dam will provide water for crop cultivation covering approximately 5 000 hectares of irrigated farmland and provide employment for several hundred people in the process. For the author (a young engineer), it was a dream come true to be part of the construction of such a monumental structure. Projects of this magnitude may influence the direction of one’s career, cause lifestyle changes and challenge the perspective and vision of an engineer’s life. This paper shares lessons learned in overcoming project and individual challenges faced by a young engineer and provides a message to supervisors as to what may be expected from the younger generation.

 

Download the full technical paper.

Download

 

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence