Vertical Expansion of a 41-m High Geosynthetic Reinforced Soil Slope

Vertical Expansion of a 41-m High Geosynthetic Reinforced Soil Slope

Author: Fanny Herrera, Luis Chahua, Elio Murrugarra, David Reaño
Conference: Tailings and Mine Waste 2018
Date: September 30-October 2, 2018

ABSTRACT
The Pampa Verde waste dump expansion is highly driven by the following constraints: (1) relatively limited options for laterally extending the existing buttress; (2) the need to satisfy both static and seismic stability; (3) the need to properly select high-strength reinforcement products; (4) the importance of conducting material-specific tests to characterize the soil-geosynthetic interaction; and (5) the complex geometry of the overall system, particularly its global stability. The existing facility is stabilized by a geosynthetic-reinforced toe buttress that includes a compacted earth fill, with a slope of 2.1H:1V, overlying an mechanically stabilized earth wall (MSE or reinforced soil). The MSE structure involves upper and lower MSE wall sections with a horizontal step in between. The upper section is a geogrid-reinforced wall, while the lower section is a Terramesh system involving gabions reinforced with geogrids. The overall design approach involves the design of a geosynthetic-reinforced soil slope (RSS) that would use geogrids of high tensile capacity. The design guidelines for the proposed RSS are those outlined by the US Federal Highway Administration (FHWA-NHI-10-024). A key aspect of the proposed design is the proper evaluation of the soil vs. geosynthetic interface; a total of five geogrid products were considered for possible use in the construction of the geosynthetic-reinforced slope at the Pampa Verde project.

 

Download the full technical paper.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence