Green Energy for the Copperbelt

Green Energy for the Copperbelt

Publication: Mining Review Africa
Issue: June 2020

Ensuring sustainable and beneficial hydropower projects

The expansion of mining in the Zambia-DRC Copperbelt has led to a severe shortage of electricity. With high annual rainfalls and large rivers, it makes sense that countries on the Copperbelt are turning to hydropower to address the additional demand.

Hydropower does not consume water but rather the water is used to turn turbines to generate electricity and then released back into the river. Private developers have identified the opportunity and are addressing the power deficit through hydropower projects in the region.

While hydropower is considered green energy, the impacts of these developments, power lines and access roads can have an immense environmental and social impact. It is for this reason that an environmental and social impact assessment (ESIA) that utilises a multi-disciplinary approach is crucial in hydropower project development.

An ESIA sets out to determine whether the benefits outweigh the impact and if this is not the case, then a project should not proceed. Also, by identifying the impact on communities and the environment, the developer can plan a project in a manner that avoids or minimises impacts as far as possible or mitigates these impacts. In addition, not only must the environmental and social impacts be assessed, but also closely scrutinised by international investors before they decide to fund a project.

An area of a river that has a falling gradient is selected for a hydropower development. Water is impounded by building a dam or a weir. This water is diverted via an intake structure to the hydropower station to generate power and is then released downstream. The effect is that the natural flow pattern of the river is affected or altered. To mitigate the effect on the aquatic environment, an Environmental Water Requirement (EWR) study is done to inform the downstream water requirements.

Knight Piésold (KP) is currently involved in ESIAs for two major hydropower developments: the Lufubu project in Zambia and the Sombwe project in the Democratic Republic of Congo (DRC). Both projects are in remote Greenfields areas where there is currently no power supply.

Addressing critical power and social needs

The Lufubu hydropower project is located in northern Zambia on the Lufubu River. The project will entail the development of a cascade of three impoundments and power plants with an initial installed capacity of 163 MW. An ESIA was previously completed and approved by the regulator; however, KP has been appointed by the Lufubu Power Company to address international funding requirements and also to determine the EWR for the project. The EWR will determine the volume of water and flow regime required to sustain the ecosystem and downstream water users.

The Lufubu ESIA is challenging due to the remoteness of the site. The direct project area is uninhabited, but there are various communities residing downstream between the cascades and Lake Tanganyika. In this case there could be an impact on these communities’ livelihoods because of the altered flow of the river. KP will use its local expertise in Zambia to conduct consultation with affected communities and update the resettlement requirements.

On account of the socio-economic circumstances in the region, the project may result in an influx of people seeking economic opportunities. This social influx has knock-on effects on the environment. The Sombwe hydropower project is on the Lufira River in the Mitwaba territory of Haut-Katanga in DRC. Its developer, Kipay Investments, is a DRC-based company aiming to address the immense power deficit in the DRC.

The project involves the construction of a 90 m high roller compacted concrete arch gravity dam, intake structure, headrace tunnel and a powerhouse approximately 3 km downstream of the dam. Sombwe will generate 150 MW of power that will be supplied to the substation at the town of Fungurume via a 220 kV powerline.

As with Lufubu, the Sombwe site is located in a remote area in the DRC with very limited access, especially in the wet season. KP aims to ensure that the aquatic and terrestrial biodiversity components are adequately addressed. Also, Kipay investments aims to use the project to facilitate upliftment of the local community and therefore KP will prioritise social studies and consultation.

Currently, due to COVID-19 restrictions, site visits cannot be undertaken but KP is working towards getting other parts of the ESIAs completed and will mobilise to site as soon as international travel restrictions are lifted.

 

Download the full article.

Download

Perspectivas recientes

Febrero 2024
Empoderamiento y Resiliencia
Enero 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
Enero 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects
Noviembre 2023
Knight Piésold Commences with the ESIA for Haib Copper
Noviembre 2023
Insights from the Compilation and Critical Assessment of Breach and Runout Characteristics from Historical Tailings Dam Failures: Implications for Numerical Modelling
Noviembre 2023
Earthquake-induced Deformation Analysis of a TSF Undergoing Tailings Reprocessing
Noviembre 2023
Case Study: Approach to Determining the Risk Mitigation Priority of a Historic TSF in North America
Octubre 2023
Data Management and Insights for Effective Tailings Storage Facility Management
Octubre 2023
The Role of Sensitivity Analysis in Selecting Dam Breach Parameters
Octubre 2023
Influence of Increased Confining Stress on Undrained Behavior of Tailings: A Case History at the Candelaria Mine
Octubre 2023
The Re-use of Existing Bituminous Stabilised Materials for the Rehabilitation of National Route 7 - Case Study
Septiembre 2023
Transición energética para gerentes de mina
Agosto 2023
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Julio 2023
Selection of Soil Shear Strength Parameters Based on Integrated In Situ Tests, Lab Tests and Numerical Calibration Approach
Junio 2023
Leveraging Knowledge and Experience of a Well-Formed Independent Tailings Review Board to Enhance Tailings Facility Safety
Mayo 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
Febrero 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile
Febrero 2023
Geotechnical Characterization of Collapsible Salty Sands Subjected to Monotonic and Cyclic Loadings – A Case Study for Areas with High Seismicity
Noviembre 2022
Application of the 3D Limit Equilibrium Method in Tailings Dam Breach Analysis
Noviembre 2022
Evaluation of Tailings Behaviour for Dam Breach Assessment