Design and Operation of the Multi-Intake 16 MW Box Canyon Run-of-River Hydroelectric Project

Design and Operation of the Multi-Intake 16 MW Box Canyon Run-of-River Hydroelectric Project

Author: Benoit Otis
Conference: HydroVision 2017
Date: June 27-30, 2017

ABSTRACT
The 16 MW Box Canyon Hydroelectric facility, located in southwest British Columbia, Canada was commissioned in early 2016. Knight Piésold Ltd. was retained by Box Canyon Hydro Corporation (a subsidiary of Elemental Energy) for the development phase, detail design and construction phases of the facility. The facility is comprised of three main water intakes, and six small tributary intakes. The water conveyance system includes approximately 7 km of pipeline connecting all intakes to a single 1 km (0.6 mile) long buried high-pressure steel penstock diverting generation flows of up to 3.96 m3/s. The facility operates under a gross head of 516.90 m.

Long-term (>20 years) synthetic stream flow datasets were developed for each creek, based on stream flow monitoring and a concurrent long-term regional discharge dataset. Detailed hydraulic analyses at varying discharge conditions for each creek was required to design a balanced water conveyance system, while also  determining the available gross head, net head and hydraulic transient conditions during the operations of the
facility.

Hydraulic analyses were completed using fluid dynamics principles and with KYPIPE analysis software. This allowed for comparison of the results and impacts of the theoretical considerations including friction losses and minor losses of the pipelines and penstock. Head losses and hydraulic transient conditions were detailed to define the operation ranges of the facility and to design and select the facility’s equipment. Penstock and pipelines materials were optimized in order to improve performance and lower the overall capital costs of the facility. Valves, instrumentation and generating equipment required careful selection for optimum operation at all design flow conditions, operation pressures and maximum efficiency. This paper and presentation will provide an overview of the key design challenges and innovative solutions conceived in the development of this multi-intake high-head run-of-river hydroelectric facility.

 

Download the full technical paper.

Download

Perspectivas recientes

Noviembre 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
Noviembre 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
Noviembre 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
Septiembre 2024
Grouting to reduce seepage at Neckartal Dam, Namibia
Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
A Diverse Approach in Geosynthetic Barrier Systems to Ensure Environmental Compliance of Existing TSFs
Julio 2024
Case History: Application Of Geosynthetics in A Tailings Storage Facility Rockfill Buttress Construction Project
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Challenges in Ensuring Stability Whilst Providing Environmental Compliance for Existing TSFs