Knight Piésold: Driving Integrated Water Management for Mining's Future

Knight Piésold: Driving Integrated Water Management for Mining's Future

Publication: Mining Review Africa
Issue: Issue 4 2026

As climate pressures, stricter regulations and evolving tailings standards reshape the mining industry, water management is becoming a critical priority for mines across Africa. Robert Greyling, technical director, Water and Power at Knight Piésold, says mining companies must treat water management as a strategic part of the entire mining lifecycle rather than a secondary environmental function.

Greyling says water management today extends far beyond supplying process water to a mine, influencing operational stability, tailings safety, environmental performance and long-term sustainability.

“Water on mines should be treated as a strategic resource. Water scarcity, climate change impacts, stricter water quality standards and increasing scrutiny from regulators and investors are driving mines to reduce freshwater intake, minimise discharge and develop credible no-net-harm strategies,” he explains.

Mining companies must balance operational demands with environmental protection amid increasingly unpredictable climate conditions, while managing significant volumes of water through effective recirculation, storage, separation and treatment systems.

Water balance and tailings design

Knight Piésold addresses this challenge through integrated water management strategies that connect hydrology, hydrogeology, water infrastructure, tailings management and treatment systems.

These include water balance modelling, groundwater investigations, river diversions, mine dewatering, water treatment planning and tailings storage facility integration. “At the core of the mine water management plan is its life-of-mine water balance model.

Instead of relying on static estimates, engineers can simulate dynamic inflows, outflows and storage under a range of wet, dry and climate- change scenarios,” says Greyling. These models help mining companies plan for extreme rainfall, drought and operational demands while reducing flooding, overtopping and seepage risks.

Hydrological assessments also improve tailings storage facility design by determining spillway sizing, flood routing, freeboard allowances and seepage controls. “The result is a tailings storage facility layout that minimises pond size, keeps water away from embankments and ensures flood storage and discharge capacities remain appropriate throughout operation,” Greyling notes.

He adds that water management has become increasingly important under the Global Industry Standard on Tailings Management, which emphasises water control, dam safety and long-term closure planning.

Water reuse and recycling are also central to mining operations as companies seek to reduce freshwater use and improve ESG performance, with Knight Piésold supporting clients through optimised storage layouts, return water systems, pumping infrastructure and targeted treatment technologies.

Greyling says effective water management requires long-term planning from project development through to closure and rehabilitation. The company integrates climate risks, future water demands and post-closure requirements into mine design while helping clients move from static designs to active water governance through monitoring systems, forecasting tools and trigger-action response plans.

As mining companies face growing pressure to improve sustainability and operational performance, Greyling believes integrated water management will remain a central role in building safer mines across Africa.

By embedding water planning across the full mining lifecycle, companies can improve resilience, reduce environmental risk and strengthen long-term operational performance.

 

Read the full article on Mining Review Africa.

Download the full article.

Download

Perspectivas recientes

Agosto 2026
Knight Piésold: Engineering Namibia's Future
Julio 2026
Stochastic Hydrology Reveals the Controls of Forest Harvesting - Peakflow Causal Relations in Snow-Transient Environment
Junio 2026
From Liability to Asset: A Sustainable Approach for Mine Tailings Remediation in Peru
Junio 2026
Unsaturated Shear Strength Characteristics of Filtered Tailings through Modified Direct Simple Shear (MDSS) Apparatus
Mayo 2026
Building Resilient Mines: Knight Piésold's Multidisciplinary Engineering Expertise
Abril 2026
Considerations in the Design and Construction of Ventilation and Surge Shafts for the uMWP Phase 1 Water Transfer Tunnel
Abril 2026
Design Considerations and Construction Strategies for the uMkhomazi Water Project Phase 1
Abril 2026
The uMkhomazi Transfer Tunnel: Background, Geotechnical Conditions and Tunnel Design Considerations
Marzo 2026
Influencia de la interfaz en la estabilidad de un patio de lixiviación: un análisis de sensibilidad
Marzo 2026
Evaluación de alternativas para TSF mediante análisis de cuentas múltiples: selección de ubicación y método constructivo
Marzo 2026
El DAR como pilar de la gobernanza: GISTM: evaluación del impacto acumulativo del desviaciones en la gestión proactive de riesgos de depositos de jales. Estudio de caso.
Febrero 2026
A Method to Assess the Feasibility of Injection Leaching on Heap Leach Slopes
Enero 2026
Knight Piésold Expanding Engineering Solutions Amid Africa's Mining Evolution
Noviembre 2025
Case Study: Assessing Construction-Induced Deformations in Tailings Storage Facility Embankments
Noviembre 2025
Geotechnical Characterization of Cyclone Underflow Tailings under High Confining Pressures
Octubre 2025
Practical Significance of Strain-Dependency and 3D-Confinement-Dependency of Dilation Mobilisation for Rock Slope Stability Evaluation
Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown