A Brief History of the RCC at Neckartal Dam

A Brief History of the RCC at Neckartal Dam

Author: Edwin Lillie, Elvin Pesch, Louis Barnard
Conference: SANCOLD Annual Conference and AGM 2018
Date: November 7-9, 2018

ABSTRACT
The construction of Neckartal Dam started in September 2013. The full-scale trial section was done in August 2015 and the first RCC was placed on the dam foundation in October 2015. The RCC placement was completed 32 months later in May 2018. This paper gives a brief history of the RCC through the various project phases. Two mixes were used, a 20/38 high cementitious mix for an impermeable zone (Zone 1) in the upstream face of the dam and two 10/38 low cementitious mixes for the main body of the dam (Zone 2). The Contractor produced a total of 3.12 million tons of aggregate for the project over 33 months at an average of 94 800 tons per month. The overall crushing plant efficiency over the 33 months of production was 33%. The Contractor produced a total of 836 000m3 of RCC for the project over 32 months at an average rate of 26 127m3 per month. The overall plant efficiency over the 32 months was 17%. Over the whole RCC placement period, there were interruptions for many reasons, some within the Contractor’s control such as plant breakdowns, insufficient sand, cement and/or fly ash, waiting for shutters to be moved, preparing RCC surfaces, sequencing of the intake tower construction etc. There were also some delays beyond the Contractor’s control such as strikes, break downs and late payments. The RCC cube tests indicated that the set RCC easily achieved the strength requirements of the project specification of 20MPa at 365 days for Zone 1 and 10MPa at 365 days for Zone 2.

 

Download the full technical paper.

Download

Perspectivas recientes

Noviembre 2026
Characterization of a Tailings Dam Foundation in Dolomitic Rock and Soft Soils and Proposed Treatment with Stone Columns Filled with Cement Grout
Noviembre 2026
Comparison of Remeshing and Material Point Method Approaches for Large-Strain Assessment of a Tailings Storage Facility Under Residual Undrained Strength Conditions
Noviembre 2026
Shear Strength Assessment of Run‑of‑Mine Waste Rock Used as Support Fill at the Aitik Mine Through Empirical Approaches
Noviembre 2026
RTFE Lessons Learned from a TSF Buttressing Project
Noviembre 2026
A Framework for Interpreting Variable Penetration Rate CPTu Tests in Mine Tailings
Noviembre 2026
GeoStable Tailings Laboratory Mixture Trial
Noviembre 2026
Facing a Slithery Dragon: Systematics of the Petracola Ventrimaculata (Boulenger, 1900) Species Complex (Squamata: Gymnophthalmidae) with Description of Five New Species
Octubre 2026
Improving Slope Deformation and Stability Predictions in Anisotropic Rock Masses: A Strain- and Confinement-Dependent Dilation Model for Ubiquitous Joints
Octubre 2026
Integrated Approach to Rapidly Iterate Through LEA Stability Analyses for Design of Staged Construction Over Silty Clay Soils
Octubre 2026
2026 CCE Award of Excellence: Site C Temporary Works
Septiembre 2026
Case Study: Paste Tailings Transport Optimization, Model Calibration and Concentration Sensitivity
Septiembre 2026
Multiple Account Analysis of Tailings Technologies to Define the Next TSF Stages
Septiembre 2026
Climate Change Considerations in Mine Water Management and Engineering Design for Reclamation Planning
Agosto 2026
Beyond the Design Storm: From Compliance Metrics to Adaptive Operations for Consecutive Minor Events in Dams
Agosto 2026
Knight Piésold: Engineering Namibia's Future
Julio 2026
Knight Piésold: Driving Integrated Water Management for Mining's Future
Julio 2026
Stochastic Hydrology Reveals the Controls of Forest Harvesting - Peakflow Causal Relations in Snow-Transient Environment
Junio 2026
From Liability to Asset: A Sustainable Approach for Mine Tailings Remediation in Peru
Junio 2026
Unsaturated Shear Strength Characteristics of Filtered Tailings through Modified Direct Simple Shear (MDSS) Apparatus
Mayo 2026
Building Resilient Mines: Knight Piésold's Multidisciplinary Engineering Expertise