Building for the Future

Building for the Future

Publication: eThekwini
Issue: April 2017

The first principle of problem solving is to look to history as someone, somewhere, has, in all probability, solved your problem already. While this is true, one still needs to implement the solution. Herein lies the crux of the matter. Without the right people, possessing the necessary skills and experience, no solution, no matter how brilliant, will work. This is particularly true of water supply infrastructure. Fortunately, in South Africa, we don’t have to look very far to find these people. We have a home-grown, problem-solving, solution implementing civil engineering company right here in eThekwini.

Celebrating 96 years of service, Knight Piésold Consulting is a proudly South African company. Established in 1921 with a single office in Johannesburg, the firm today has offices in 14 countries. Its “deliver now, build for the future” approach, driven by a policy of skills retention, black economic empowerment and investing in young engineering graduate development, has produced a carefully balanced set of engineering skills and expertise. Knight Piésold operates “centres of excellence” in each town or city in which it operates, with KwaZulu-Natal being a centre of excellence for water supply infrastructure. With innovation and first principles in mind, state-of-the-art information communications technology and a well-defined internal project management and quality-control system, Knight Piésold Consulting’s various centres are able to work seamlessly and effectively, on a national and international basis.

The KwaZulu-Natal centre operates under the leadership of Amal Doorgapershad, regional manager for the province. Amal is a professional civil engineer with over 22 years of experience in the field of bulk water supply. Doorgapershad points out that Knight Piésold has undertaken projects in the eThekwini municipal area since the early 1990s, well before the consolidation of the previous council areas into the single eThekwini Metropolitan Municipality. He states that eThekwini is a key client for Knight Piésold and the firm will continue to provide the highest standard of professional services to the municipality and its residents.

While each project is different, local knowledge and global expertise enable the development of effective solutions to meet environmental, social and economic challenges. According to Doorgapershad, past eThekwini Municipality projects completed by Knight Piésold, have improved the living conditions of thousands of Durban residents. When the Western and Northern aqueducts are completed, these projects will benefit many more thousands of people, particularly those most in need of a reliable, basic water supply.

With eThekwini’s population of 3.45 million people – growing at a rate of about 1% annually – the ever-increasing demand for water and electricity requires ongoing infrastructure development. To accommodate an estimated additional 8 500 families settling in eThekwini each year, significant infrastructure projects are needed. Knight Piésold has played a leading role in the following key projects that will have a positive impact on the lives of Durban’s residents for decades to come.

 

Download the full article.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence