Hydrodynamic Modelling of Intakes for Run-of-River Hydroelectric Projects

Hydrodynamic Modelling of Intakes for Run-of-River Hydroelectric Projects

Author: V. Martin
Conference: Canadian Hydrotechnical Conference 2015
Date: April 29-May 2, 2015

Run-of-river, diversion-type hydroelectric projects on steep mountainous streams create changes in environmental conditions, including modified hydraulic and sediment transport conditions in the headpond upstream of the flow diversion intake and in the diversion section of the stream between the intake and the tailrace. These types of changes can lead to environmental and operational challenges that require careful consideration at the project design stage in order to achieve a successful, sustainable project. Hydrodynamic modelling including two dimensional and Computational Fluid Dynamics (CFD) modelling were used to investigate the flow and sediment transport patterns through the headponds and intake structures of one existing and two proposed run-of-river hydroelectric projects located in coastal British Columbia. The intake structures consist of a concrete weir, a Coanda screen or an inflatable rubber weir, an intake facility with conveyance to the penstock entrance, and sluicing facilities for flushing sediment from the headpond. This paper reviews the relevant environmental, engineering and modelling issues for each project and discusses how results from these numerical modelling tools were used in fine-tuning the intake designs.

 

Download the full technical paper.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence