Knight Piésold Turns 100

Knight Piésold Turns 100

Publication: Mining Review Africa
Issue: January 2021

This year, Level 1 BBBEE, employee-owned Knight Piésold celebrates a milestone achievement few companies ever realise – 100 years in business. Its journey over the decades has resulted in the establishment of a truly global brand, with a very successful South African subsidiary. “Today, we proudly proclaim to be one of the oldest African owned engineering consultancy firms in Africa, with an internationally recognised pedigree of skill sets, committed to serving and uplifting the local markets in which we operate,” MD VISHAL HARIPERSAD tells LAURA CORNISH.

It is Knight Piésold Southern Africa’s (KPSA) approach to doing business that has largely resulted in the successes it has achieved, and will continue to achieve moving forward. “We are African at heart and we embrace the local cultures of any jurisdiction we operate in. This has resulted in the creation of one of the most progressive, fastest growing and diligent companies on the continent,” Haripersad continues.

The company is largely recognised for its mine residue (tailings and heap leach deposition) design and execution capabilities within the mining sector, but its expertise stretches much further, with a well-established footprint and track record of delivering major infrastructure projects as well.

“As we move into the next stage of building another 100 years in the industries we serve, our intention is to deliver on a five-year growth strategy which will see us build our tailings reputation further, while showcasing and delivering our repertoire of infrastructure and geotechnical expertise skills to the African mining sector as well,” Haripersad highlights.

In addition to road, railway, port and airport experience, Knight Piésold has delivered a wide range of water and power projects as well – two areas of great interest to the mining sector at present. Cost effective water and power security currently play a significant role in the financial viability of mining projects and this is an area which the company can contribute towards – particularly renewable power projects that offer the industry a greener footprint.

The company has more recently delivered a number of run-of-river hydropower schemes in Zambia and the Democratic Republic of Congo (DRC), regions it has a particularly strong focus and presence in. “Barrick’s Azambi hydropower plant for its Kibali gold mine is the perfect demonstration of what we can deliver in both water and power. The greater central African region would benefit enormously from similar projects.”

 

Download the full article.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence