Knight Piésold Turns 100

Knight Piésold Turns 100

Publication: Mining Review Africa
Issue: January 2021

This year, Level 1 BBBEE, employee-owned Knight Piésold celebrates a milestone achievement few companies ever realise – 100 years in business. Its journey over the decades has resulted in the establishment of a truly global brand, with a very successful South African subsidiary. “Today, we proudly proclaim to be one of the oldest African owned engineering consultancy firms in Africa, with an internationally recognised pedigree of skill sets, committed to serving and uplifting the local markets in which we operate,” MD VISHAL HARIPERSAD tells LAURA CORNISH.

It is Knight Piésold Southern Africa’s (KPSA) approach to doing business that has largely resulted in the successes it has achieved, and will continue to achieve moving forward. “We are African at heart and we embrace the local cultures of any jurisdiction we operate in. This has resulted in the creation of one of the most progressive, fastest growing and diligent companies on the continent,” Haripersad continues.

The company is largely recognised for its mine residue (tailings and heap leach deposition) design and execution capabilities within the mining sector, but its expertise stretches much further, with a well-established footprint and track record of delivering major infrastructure projects as well.

“As we move into the next stage of building another 100 years in the industries we serve, our intention is to deliver on a five-year growth strategy which will see us build our tailings reputation further, while showcasing and delivering our repertoire of infrastructure and geotechnical expertise skills to the African mining sector as well,” Haripersad highlights.

In addition to road, railway, port and airport experience, Knight Piésold has delivered a wide range of water and power projects as well – two areas of great interest to the mining sector at present. Cost effective water and power security currently play a significant role in the financial viability of mining projects and this is an area which the company can contribute towards – particularly renewable power projects that offer the industry a greener footprint.

The company has more recently delivered a number of run-of-river hydropower schemes in Zambia and the Democratic Republic of Congo (DRC), regions it has a particularly strong focus and presence in. “Barrick’s Azambi hydropower plant for its Kibali gold mine is the perfect demonstration of what we can deliver in both water and power. The greater central African region would benefit enormously from similar projects.”

 

Download the full article.

Download

Perspectivas recientes

Noviembre 2026
Characterization of a Tailings Dam Foundation in Dolomitic Rock and Soft Soils and Proposed Treatment with Stone Columns Filled with Cement Grout
Noviembre 2026
Comparison of Remeshing and Material Point Method Approaches for Large-Strain Assessment of a Tailings Storage Facility Under Residual Undrained Strength Conditions
Noviembre 2026
Shear Strength Assessment of Run‑of‑Mine Waste Rock Used as Support Fill at the Aitik Mine Through Empirical Approaches
Noviembre 2026
RTFE Lessons Learned from a TSF Buttressing Project
Noviembre 2026
A Framework for Interpreting Variable Penetration Rate CPTu Tests in Mine Tailings
Noviembre 2026
GeoStable Tailings Laboratory Mixture Trial
Noviembre 2026
Facing a Slithery Dragon: Systematics of the Petracola Ventrimaculata (Boulenger, 1900) Species Complex (Squamata: Gymnophthalmidae) with Description of Five New Species
Octubre 2026
Improving Slope Deformation and Stability Predictions in Anisotropic Rock Masses: A Strain- and Confinement-Dependent Dilation Model for Ubiquitous Joints
Octubre 2026
Integrated Approach to Rapidly Iterate Through LEA Stability Analyses for Design of Staged Construction Over Silty Clay Soils
Octubre 2026
2026 CCE Award of Excellence: Site C Temporary Works
Septiembre 2026
Case Study: Paste Tailings Transport Optimization, Model Calibration and Concentration Sensitivity
Septiembre 2026
Multiple Account Analysis of Tailings Technologies to Define the Next TSF Stages
Septiembre 2026
Climate Change Considerations in Mine Water Management and Engineering Design for Reclamation Planning
Agosto 2026
Beyond the Design Storm: From Compliance Metrics to Adaptive Operations for Consecutive Minor Events in Dams
Agosto 2026
Knight Piésold: Engineering Namibia's Future
Julio 2026
Knight Piésold: Driving Integrated Water Management for Mining's Future
Julio 2026
Stochastic Hydrology Reveals the Controls of Forest Harvesting - Peakflow Causal Relations in Snow-Transient Environment
Junio 2026
From Liability to Asset: A Sustainable Approach for Mine Tailings Remediation in Peru
Junio 2026
Unsaturated Shear Strength Characteristics of Filtered Tailings through Modified Direct Simple Shear (MDSS) Apparatus
Mayo 2026
Building Resilient Mines: Knight Piésold's Multidisciplinary Engineering Expertise