Leveraging Knowledge and Experience of a Well-Formed Independent Tailings Review Board to Enhance Tailings Facility Safety

Leveraging Knowledge and Experience of a Well-Formed Independent Tailings Review Board to Enhance Tailings Facility Safety

Authors: Theo Gerritsen1, Tamara Johndrow2, Paul W. Ridlen3, Christina Winckler4, Lisa Yenne5
Conference:  91st ICOLD Annual Meeting
Date: June 11-15, 2023

1 Rio Tinto, Queensland, Australia
2 Freeport-McMoran, Arizona USA
3 Knight Piésold, Colorado, USA
4 AngloAmerican, Florida, USA
5 AECOM, Colorado, USA

ABSTRACT

Independent tailings review boards (ITRBs) have been used for tailings storage facilities (TSFs) by the authors for over 30 years under a variety of naming conventions. ITRBs have been recommended in several national and international guidelines, such as in the International Council on Mining and Metals (ICMM) Tailings Management Good Practice Guide and are now a requirement in the voluntary Global Industry Standard on Tailings Management (GISTM) published by ICMM, Principles for Responsible Investment, and United Nations Environment Program.

This paper draws on the experiences and lessons learned and discusses key features of successfully implementing ITRBs to support resilient designs and operational excellence. The paper focuses on the interaction between the Operator’s team, the Engineer of Record (EoR), and the ITRB. It also discusses the need for a range of experiences, expertise, traits, and skills in forming effective ITRBs are described and the expectations of all involved parties to achieve an effective team with a shared purpose. Guidance on organizing, supporting, evaluating, and managing expectations of the ITRB are included. The need for strategic planning and formalizing the Independent Review process of this part of a Tailings Management System is emphasized.

 

Download the full paper.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence