Novel Application of Proven Best Available Technologies to Stabilize a Historical Tailings Impoundment

Novel Application of Proven Best Available Technologies to Stabilize a Historical Tailings Impoundment

Author: Amy Adams, Daniel Friedman, Ken Brouwer, Scott Davidson
Conference: CDA Annual Conference
Date: October 14-20, 2017

ABSTRACT
Historical tailings impoundments may contain saturated semi-fluid materials at depth, long after tailings deposition has ceased and after surface reclamation has been completed. These saturated materials can liquefy and flow if the impoundment is compromised. A historical tailings pile can also present a risk to an underground mine development if there is potential for the mine development to generate a propagating zone of cracking and/or surface subsidence that ultimately interacts with the tailings impoundment. The risk of a sudden mudrush breach can be mitigated by using ground improvement techniques to reduce the potential for the tailings to flow.

This paper presents a case study for the New Afton Mine located in British Columbia, Canada. The opportunities to use best available technologies to reduce the risks associated with operating and closed tailings facilities are presented and discussed. The emphasis is on novel application of simple and proven technologies to efficiently and effectively stabilize the tailings to achieve the ultimate objectives for dam and mine safety.

 

Download the full technical paper.

Download

 

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence