Precast, Modular Construction for Water Impoundment Infrastructure

Precast, Modular Construction for Water Impoundment Infrastructure

Author: Peter Drown, Andrew Sanna, Norm Bishop
Conference: HydroVision 2017
Date: June 27-30, 2017

ABSTRACT
Physical civil construction is the largest single component of new hydropower development cost, from 40%-90% of total capital cost depending on the project size (HRF/ORNL, 2014). Risk associated with civil-related schedule and corresponding budget overruns for new projects are significant, and can be due to weather and river flood events, contracting delays, major equipment lead-times, and other factors caused by the lengthy civil and equipment installation construction periods. Precast concrete modular structures offers the potential to reduce these delays and costs by moving traditional on-site construction tasks to an off-site, controlled precasting location. The civil structure is built with modules using reinforced precast concrete, and transported to site where the modules are joined together to form a monolithic structure. The benefits of precast concrete have been well-proven in many other construction industries, including commercial and residential, bridges, parking garages, hospitals and prisons. Several U.S. hydropower facilities have utilized precast elements in powerhouse construction. French Development Enterprises, LLC (FDE) has developed the “French Dam” – an infrastructure technology that applies precast modules to construct powerhouses, dams, weirs and diversion structures. This paper examines the application of precast concrete modules as an alternative to conventional construction when applied to dams and diversion structures.

 

Download the full technical paper.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence