Solving Spillway Geometry for Three-dimensional Flow

Solving Spillway Geometry for Three-dimensional Flow

Author: G.L. Coetzee, S.J. van Vuuren
Conference: 87th Annual Meeting of the International Commission on Large Dams
Date: June 9-14, 2019

ABSTRACT
The Ogee profile is one of the most studied hydraulic relationships used in the design of spillways. The high discharge efficiency and nappe-shaped profile ensure an effective hydraulic system, if applied under the correct conditions. However, in a recent study, the existing Ogee profile relationship, formulated for two-dimensional flow conditions, proved to be insufficient for three-dimensional flow conditions. Data obtained from a detailed physical model study and extensive computational fluid dynamic simulations allowed for a qualitative and quantitative comparison of the bottom nappe of the fluid profile across an aerated sharp-crested weir. The study concluded in the derivation of the VC-Ogee relationship that estimates the Ogee profile under three-dimensional flow conditions. Four parameters A, B, C and D, were incorporated to accommodate the effect of three-dimensional flow. A set of VC-Ogee design curves for these parameters, for an asymmetrical approach channel with side contraction of the spillway, is presented in this paper. Further design curves to accommodate symmetrical, contracted and uncontracted approach channels as well as combinations of these conditions, will be made available in future.

 

Download the full technical paper.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence