The uMkhomazi Transfer Tunnel: Background, Geotechnical Conditions and Tunnel Design Considerations

The uMkhomazi Transfer Tunnel: Background, Geotechnical Conditions and Tunnel Design Considerations

Authors: R.L. Freese1, G.J. Keyter2
Conference: SANCOT Symposium 2026
Date: April 13-14, 2026

1 Knight Piésold, South Africa
2 SRK Consulting, South Africa

ABSTRACT

The uMkhomazi Water Project Phase 1 (uMWP-1) currently represents the largest civil tunnelling project in South Africa in three decades. Its centrepiece is the uMkhomazi Transfer Tunnel, a 31.2 km long, 3.5 m diameter tunnel designed to transfer water from the proposed Smithfield Dam to a new Water Treatment Works (WTW) which will supply potable water to the eThekwini metropolitan area in the KwaZulu-Natal Province (KZN), South Africa. The tunnel will be excavated through sedimentary and intrusive igneous formations using Tunnel Boring Machines (TBMs), following some initial drill and blast excavation of tunnel portals and access declines.

Feasibility study investigations indicated a mixed geological setting comprising horizontally bedded sedimentary sequences of shales, mudstones, siltstones, and sandstones, which are variably indurated and with significant variation in strength. These sedimentary strata have been extensively intruded by dolerite dykes and sills, while zones of fractured and weathered rock also occur. While rock mass conditions are generally favourable to TBM tunnelling, site-specific concerns such as mixed (hard-soft) face conditions, high water pressures, potentially gas-bearing rock, chemical aggressivity, weak/sheared shale horizons, rock durability and potential squeezing conditions will have to be considered during design.

The design phase underway now, includes comprehensive geotechnical investigations comprising rotary core drilling, geophysical (seismic and resistivity) surveys, wireline logging, packer testing, hydrofracture and overcoring in-situ stress testing. This is required to ensure optimal final tunnel alignment, ground support and final lining designs, excavation method selection, and waterproofing strategies, to mitigate technical and contractual risks. These investigations were developed to support the development of a Geotechnical Baseline Report (GBR) in line with ASCE and FIDIC Emerald Book Guidelines.

This paper presents the background and layout of the project, the scope of the geotechnical investigations, and expected key tunnel design considerations.

 

Download the full paper.

Download

Perspectivas recientes

Abril 2026
Considerations in the Design and Construction of Ventilation and Surge Shafts for the uMWP Phase 1 Water Transfer Tunnel
Abril 2026
Design Considerations and Construction Strategies for the uMkhomazi Water Project Phase 1
Marzo 2026
Influencia de la interfaz en la estabilidad de un patio de lixiviación: un análisis de sensibilidad
Marzo 2026
Evaluación de alternativas para TSF mediante análisis de cuentas múltiples: selección de ubicación y método constructivo
Marzo 2026
El DAR como pilar de la gobernanza: GISTM: evaluación del impacto acumulativo del desviaciones en la gestión proactive de riesgos de depositos de jales. Estudio de caso.
Febrero 2026
A Method to Assess the Feasibility of Injection Leaching on Heap Leach Slopes
Enero 2026
Knight Piésold: Expanding Engineering Solutions Amid Africa's Mining Evolution
Noviembre 2025
Case Study: Assessing Construction-Induced Deformations in Tailings Storage Facility Embankments
Noviembre 2025
Geotechnical Characterization of Cyclone Underflow Tailings under High Confining Pressures
Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Klamath River Renewal Project
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis