What it Means to be an Engineer of Record

What it Means to be an Engineer of Record

Author: Andrew Copeland
Conference: 6th International Mining and Industrial Waste Management Conference
Date: October 29-31, 2018

ABSTRACT
The term Engineer of Record (EoR) is commonly used in North America to define the responsible person for  design and construction phases of a project. For tailings storage facilities (TSF’s), an EoR is often appointed as the person technically responsible for seeing that a TSF is built according to the design. The use of this appointment has increased due to recent high profile TSF failures, and has spread to countries outside of North America, especially for mining companies that are based or listed there. Recent updates to national/international TSF guidelines suggest appointing an EoR is good practice.

TSF’s are built over many years, so the initial capital construction phase is often well supervised according to design drawings and technical specifications, but then enters a commissioning and operation phase, before reaching a closure phase. It is during these multiple year phases, where deviations from the design are possible, and often the operation is undertaken by the Mine or a third party contractor who may not always appreciate the implications of poor operation/construction. Since the EoR is not on site full time, how can he/she take on such an appointment and responsibility for anything that might go wrong? The only way this is possible is if the EoR is given greater authority. This paper discusses whether an EoR should accept the appointment, and if an EoR is appointed, what responsibilities and authority he/she should accept.

 

Download the full technical paper.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence