Vertical Expansion of a 41-m High Geosynthetic Reinforced Soil Slope

Vertical Expansion of a 41-m High Geosynthetic Reinforced Soil Slope

Author: Fanny Herrera, Luis Chahua, Elio Murrugarra, David Reaño
Conference: Tailings and Mine Waste 2018
Date: September 30-October 2, 2018

ABSTRACT
The Pampa Verde waste dump expansion is highly driven by the following constraints: (1) relatively limited options for laterally extending the existing buttress; (2) the need to satisfy both static and seismic stability; (3) the need to properly select high-strength reinforcement products; (4) the importance of conducting material-specific tests to characterize the soil-geosynthetic interaction; and (5) the complex geometry of the overall system, particularly its global stability. The existing facility is stabilized by a geosynthetic-reinforced toe buttress that includes a compacted earth fill, with a slope of 2.1H:1V, overlying an mechanically stabilized earth wall (MSE or reinforced soil). The MSE structure involves upper and lower MSE wall sections with a horizontal step in between. The upper section is a geogrid-reinforced wall, while the lower section is a Terramesh system involving gabions reinforced with geogrids. The overall design approach involves the design of a geosynthetic-reinforced soil slope (RSS) that would use geogrids of high tensile capacity. The design guidelines for the proposed RSS are those outlined by the US Federal Highway Administration (FHWA-NHI-10-024). A key aspect of the proposed design is the proper evaluation of the soil vs. geosynthetic interface; a total of five geogrid products were considered for possible use in the construction of the geosynthetic-reinforced slope at the Pampa Verde project.

 

Download the full technical paper.

Download

Perspectivas recientes

Agosto 2026
Knight Piésold: Engineering Namibia's Future
Julio 2026
Knight Piésold: Driving Integrated Water Management for Mining's Future
Julio 2026
Stochastic Hydrology Reveals the Controls of Forest Harvesting - Peakflow Causal Relations in Snow-Transient Environment
Junio 2026
From Liability to Asset: A Sustainable Approach for Mine Tailings Remediation in Peru
Junio 2026
Unsaturated Shear Strength Characteristics of Filtered Tailings through Modified Direct Simple Shear (MDSS) Apparatus
Mayo 2026
Building Resilient Mines: Knight Piésold's Multidisciplinary Engineering Expertise
Abril 2026
Considerations in the Design and Construction of Ventilation and Surge Shafts for the uMWP Phase 1 Water Transfer Tunnel
Abril 2026
Design Considerations and Construction Strategies for the uMkhomazi Water Project Phase 1
Abril 2026
The uMkhomazi Transfer Tunnel: Background, Geotechnical Conditions and Tunnel Design Considerations
Marzo 2026
Influencia de la interfaz en la estabilidad de un patio de lixiviación: un análisis de sensibilidad
Marzo 2026
Evaluación de alternativas para TSF mediante análisis de cuentas múltiples: selección de ubicación y método constructivo
Marzo 2026
El DAR como pilar de la gobernanza: GISTM: evaluación del impacto acumulativo del desviaciones en la gestión proactive de riesgos de depositos de jales. Estudio de caso.
Febrero 2026
A Method to Assess the Feasibility of Injection Leaching on Heap Leach Slopes
Enero 2026
Knight Piésold Expanding Engineering Solutions Amid Africa's Mining Evolution
Noviembre 2025
Case Study: Assessing Construction-Induced Deformations in Tailings Storage Facility Embankments
Noviembre 2025
Geotechnical Characterization of Cyclone Underflow Tailings under High Confining Pressures
Octubre 2025
Practical Significance of Strain-Dependency and 3D-Confinement-Dependency of Dilation Mobilisation for Rock Slope Stability Evaluation
Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown