Authors: Cristian Giner1, Gonzalo Laciar1, Cristian Bertolo1, Alexander Manos2
Conference: 12th International Congress on Tailings Management
Date: September 29–October 1, 2026

1 Knight Piésold, Argentina
2 Knight Piésold, USA

ABSTRACT

This paper presents a case study on the optimization of a paste tailings transport system for a tailings storage facility located in Zacatecas, Mexico. The study focuses on hydraulic performance, model calibration using field data, and sensitivity to solids concentration under varying operating conditions. The system consists of a combined pipeline configuration, including a 12-inch HDPE ramp section and 10-inch HDPE distribution lines delivering tailings to multiple discharge points across two storage cells. A steady-state hydraulic analysis was carried out over a wide operational envelope defined by variations in throughput and solids concentration to determine the operating pressures. Although laboratory testing suggested a Bingham fluid model, field measurements showed stronger agreement with a Casson-based approach. Hydraulic loss models were therefore calibrated against field data, yielding improved head loss prediction reliability. The study also highlights the influence of field data in calibrating the hydraulic gradient models and slurry properties. Calibrating the model with operational data provided the technical justification to safely maintain the existing HDPE infrastructure for new TSF elevations, avoiding a costly upgrade to carbon steel piping. Ultimately, the outcomes of this study supported informed decision-making, allowing capital investments to be minimized while maximizing the utility of the existing pumping system.

 

Download the full paper.

Download

Recent Insights

September 2026
Multiple Account Analysis of Tailings Technologies to Define the Next TSF Stages
September 2026
Climate Change Considerations in Mine Water Management and Engineering Design for Reclamation Planning
August 2026
Beyond the Design Storm: From Compliance Metrics to Adaptive Operations for Consecutive Minor Events in Dams
August 2026
Knight Piésold: Engineering Namibia's Future
July 2026
Knight Piésold: Driving Integrated Water Management for Mining's Future
July 2026
Stochastic Hydrology Reveals the Controls of Forest Harvesting - Peakflow Causal Relations in Snow-Transient Environment
June 2026
From Liability to Asset: A Sustainable Approach for Mine Tailings Remediation in Peru
June 2026
Unsaturated Shear Strength Characteristics of Filtered Tailings through Modified Direct Simple Shear (MDSS) Apparatus
May 2026
Building Resilient Mines: Knight Piésold's Multidisciplinary Engineering Expertise
April 2026
Considerations in the Design and Construction of Ventilation and Surge Shafts for the uMWP Phase 1 Water Transfer Tunnel
April 2026
Design Considerations and Construction Strategies for the uMkhomazi Water Project Phase 1
April 2026
The uMkhomazi Transfer Tunnel: Background, Geotechnical Conditions and Tunnel Design Considerations
March 2026
Influence of the Interface on the Stability of a Heap Leach Pad: A Sensitivity Analysis
March 2026
Evaluation of Alternatives for TSF Using Multiple Account Analysis: Selection of Location and Construction Method
March 2026
DAR as a Pillar of GISTM Governance: Evaluation of the Cumulative Impact of Deviations in Proactive Tailings Risk Management. Case Study.
February 2026
A Method to Assess the Feasibility of Injection Leaching on Heap Leach Slopes
January 2026
Knight Piésold Expanding Engineering Solutions Amid Africa's Mining Evolution
November 2025
Case Study: Assessing Construction-Induced Deformations in Tailings Storage Facility Embankments
November 2025
Geotechnical Characterization of Cyclone Underflow Tailings under High Confining Pressures