Characterization of a Tailings Dam Foundation in Dolomitic Rock and Soft Soils and Proposed Treatment with Stone Columns Filled with Cement Grout

Characterization of a Tailings Dam Foundation in Dolomitic Rock and Soft Soils and Proposed Treatment with Stone Columns Filled with Cement Grout

Authors: Samuel Santana Paes Loures1, Silas Santos Salgado2, Ledson Alexandre Silveira Sathler3, Claudio Barbosa4, Marcos Vinícius de Souza Silva5, BVP Engenharia, Brazil6
Conference: Tailings and Mine Waste 2026
Date: November 8–11, 2026

1 Walm Engenharia, Brazil
2 DF+ Engenharia, Brazil
3 Knight Piésold, Brazil
4 Intertechne, Brazil
5 Vale, Brazil
6 DF+ Engenharia, Brazil

ABSTRACT

This article details the engineering solution developed for the foundation of a tailings dam in the Iron Quadrangle region of Brazil. The dam consists of a compacted soil structure 86 m high. Along the dam slope and at the foot of the final embankment, a vertical metadolomite body occurs, with a general NW-SE trend and a dip of 70°-80° to the NW. The body is surrounded by phyllite, which confines it and thus constitutes a confined aquifer. The contact zone between the top of the metadolomite rock mass and the phyllite is marked by two low-resistance soils: loose residual metadolomite soil (adjacent to the top of the rock) and residual soft brecciated phyllite soil (up to the natural terrain). The rock in this region has high strength, generally between 50-100 MPa, but is highly fragmented and weathered parallel to the sedimentary bedding. The loose residual metadolomite soil, found at depths of less than 20 m and with thicknesses between 2 and 8 m, is sandy, of low strength, highly permeable, and exhibits drained behavior. CPTu tests (performed in accordance with ASTM D5778 and ISO 22476-1; Robertson, 2009) show metastable behavior and resistance close to zero, suggesting geotechnical stability challenges. Upward flow was observed in all boreholes carried out in the region of the soft soils and dolomitic rock.

Faced with the challenge of building a dam on low-resistance soils, an engineering solution was proposed, involving the construction of stone columns filled with cement-bentonite grout and grouting injections to fill discontinuities in the metadolomite top rock to a minimum depth of 4m. The proposed treatment aims to control deformations, improve the region’s strength parameters, regulate water flow in the foundation, and prevent fine particles from being carried from the foundation into the rock fractures. To define the treatment, the main results of the geotechnical investigations, CPTU surveys, flow modeling, and stability analysis of the engineering solution were presented in this article. Preliminary results from verification of the treatment’s performance indicate that this approach appears technically adequate for the specific conditions investigated and can replace and confine part of the soft soils in the foundation. It is emphasized that these results are preliminary and specific to the geological and geotechnical context of the case study presented; generalization to other settings requires additional investigations and independent analyses.

 

Download the full paper.

Download

Recent Insights

November 2026
Comparison of Remeshing and Material Point Method Approaches for Large-Strain Assessment of a Tailings Storage Facility Under Residual Undrained Strength Conditions
November 2026
Shear Strength Assessment of Run‑of‑Mine Waste Rock Used as Support Fill at the Aitik Mine Through Empirical Approaches
November 2026
RTFE Lessons Learned from a TSF Buttressing Project
November 2026
A Framework for Interpreting Variable Penetration Rate CPTu Tests in Mine Tailings
November 2026
GeoStable Tailings Laboratory Mixture Trial
November 2026
Facing a Slithery Dragon: Systematics of the Petracola Ventrimaculata (Boulenger, 1900) Species Complex (Squamata: Gymnophthalmidae) with Description of Five New Species
October 2026
Improving Slope Deformation and Stability Predictions in Anisotropic Rock Masses: A Strain- and Confinement-Dependent Dilation Model for Ubiquitous Joints
October 2026
Integrated Approach to Rapidly Iterate Through LEA Stability Analyses for Design of Staged Construction Over Silty Clay Soils
October 2026
2026 CCE Award of Excellence: Site C Temporary Works
September 2026
Case Study: Paste Tailings Transport Optimization, Model Calibration and Concentration Sensitivity
September 2026
Multiple Account Analysis of Tailings Technologies to Define the Next TSF Stages
September 2026
Climate Change Considerations in Mine Water Management and Engineering Design for Reclamation Planning
August 2026
Beyond the Design Storm: From Compliance Metrics to Adaptive Operations for Consecutive Minor Events in Dams
August 2026
Knight Piésold: Engineering Namibia's Future
July 2026
Knight Piésold: Driving Integrated Water Management for Mining's Future
July 2026
Stochastic Hydrology Reveals the Controls of Forest Harvesting - Peakflow Causal Relations in Snow-Transient Environment
June 2026
From Liability to Asset: A Sustainable Approach for Mine Tailings Remediation in Peru
June 2026
Unsaturated Shear Strength Characteristics of Filtered Tailings through Modified Direct Simple Shear (MDSS) Apparatus
May 2026
Building Resilient Mines: Knight Piésold's Multidisciplinary Engineering Expertise