2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project

2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project

Publication: Canadian Consulting Engineer
Issue: September/October 2025

“Showcases a common-sense engineering approach to the restoration of a severely degraded ecosystem in a challenging location.” – Jury

Category: Water Resources

Environmental Award and Award of Excellence winner: Knight Piésold

California’s Department of Water Resources (DWR) selected a partnership between Knight Piésold in Vancouver and Kiewit Infrastructure West in Porway, Calif., as the preferred engineering, procurement and construction (EPC) bidder to design the Salton Sea species conservation habitat project. This initiative has revitalized more than 4,000 acres of aquatic and terrestrial habitats along the shores of the state’s largest lake, which sits approximately 250 ft below sea level.

The initiative addresses critical issues surrounding the Salton Sea. The landlocked saltwater lake has been shrinking for decades, due to reduced inflows and increased evaporation exposing large areas of lakebed.

With no source of additional inflow to help maintain the lake’s previous surface area and salinity, the development of manmade, shallow habitat ponds was found to be the best solution for restoring the aquatic and terrestrial habitats that had been lost.

The resulting habitat supports biodiversity for local fish, migratory birds and native vegetation and significantly enhances air quality, helping to improve health and quality of life in surrounding communities.

Healthier for animals and people

The project team developed the new wetland habitat to mitigate significant environmental and health-related concerns. It has created a more sustainable aquatic ecosystem to counter the Salton Sea’s hypersaline water conditions, which have become inhospitable to most species. The lake is currently more than two times saltier than the Pacific Ocean and its salinity is projected to increase further as it continues to recede.

Restoring lost aquatic and terrestrial habitats is helping to rebuild the food chain by addressing disruptions that have severely impacted both local and migratory bird species, including dwindling sources of pupfish, an endangered species.

Meanwhile, the suppression of dust and reduction of airborne particulates—containing chemicals and pollutants—that are blown by wind from exposed, fine-grained lakebed sediments will prevent health risks for residents of Imperial Valley, who have historically suffered from asthma rates several times higher than the regional average.

In addition to the human health benefits, the particles are also prevented from settling on nearby agricultural lands and threatening soil quality.

Setting the flow

A key requirement of the new habitat was to provide water with lower salinity. The design team’s concept used gravity flow—in lieu of more expensive and energy-intensive pumping systems—to divert fresh water from the New River into mixing basins with the saltier water pumped from the Salton Sea. The gravity flow system incorporates a labyrinth weir, flow control gates and settling ponds.

Other features include variable speed pumps for delivering hypersaline flows, easily removable and replaceable diffuser pipes and the capability to isolate each habitat pond for independent operation. These allow for adaptive management.

Climate change considerations were also incorporated into the project, particularly the potential for high-intensity rainfall events. The design allows for flood flows to pass without impacting water levels.

The concepts that were tested and proven throughout design and construction have resulted in a ‘toolbox’ of cost-effective methods that will be carried forward for future restoration work.

Geotechnical challenges

The project’s key challenges included construction on exposed lakebed sediments in a high seismic area with liquefiable foundation materials. Sub-aqueous berm construction and accounting for a highly saline environment were also difficult.

The team developed more than 27 km of earthen berms on exposed soft lakebed sediments, requiring specialized designs and construction methods to ensure stability. With a limited amount of subsurface data available, they implemented a conservative berm design that would remain stable under the worst anticipated conditions and used thicker earthfill lifts to create a ‘bridge’ over soft foundation areas. Seepage mitigation, including a barrier, was implemented to address any concerns about seepage and internal erosion.

An offshore pump station, located one mile from shore to ensure its functionality as the sea recedes, necessitated the construction of a causeway through the Salton Sea. The team pushed local earthfill out from the shore, minimizing the need for material transportation. This approach resulted in uncompacted fill depths exceeding 10 ft in some areas. A geotechnical site investigation after completion confirmed the causeway would provide long-term, stable access to the pump station.

Lower seismic loads were adopted for earthfill berms, while critical infrastructure was designed to remain operational after seismic events. This strategy ensured cost-effectiveness without compromising safety.

Performing as prescribed

The team’s final design met or exceeded all of the DWR’s expectations and prescribed performance criteria. They successfully created a habitat covering a combined area twice the size of downtown Vancouver and Stanley Park, where endangered species are flourishing, migratory birds have returned in greater numbers, fish populations are recovering and native vegetation is again thriving.

The restoration of aquatic and terrestrial habitats provides economic opportunities through ecotourism and recreational activities as diverse birdlife returns to the area. One aspect of the project was the construction of a visitors’ centre, which provides information about the purpose of the project, restoration objectives and long-term plans to continue to restore the shorelines, all to increase public awareness and engagement.

The successful development of cost-effective methods for large-scale environmental restoration also has broader economic implications. The same methods can be applied to future projects to reduce costs and increasing the feasibility of similar restoration efforts elsewhere.

The project was completed within the allotted budget and schedule, a significant achievement given the complex nature of the work and the challenging site conditions. Next, ongoing expansion projects are set to add an additional 7,800 acres of habitat.

 

Read the article on Canadian Consulting Engineer.

Download the article.

Download

Recent Insights

September 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
September 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
September 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
September 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
September 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
August 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
July 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
July 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
June 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
June 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
June 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
May 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
April 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
November 2024
Knight Piésold: Commitment to African Excellence
November 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
November 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
November 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Grouting to Reduce Seepage at Neckartal Dam, Namibia