Neckartal Dam, the Design & Supply of the Hydro Mechanical Equipment

Neckartal Dam, the Design & Supply of the Hydro Mechanical Equipment

Author: Edwin Lillie, Guido Scalzi
Conference: AFRICA 2019
Date: April 2-4, 2019

Neckartal Dam is located on the Fish River, a tributary of the Orange River. The construction of Neckartal Dam started in September 2013. It will be the largest dam in Namibia and the eighth largest dam in Southern Africa by storage volume. Neckartal Dam is primarily for irrigation. Water is released from the dam and abstracted some 13km downstream from a weir. From there it is pumped to a balancing dam above the irrigation area. There is a mini hydropower station at the dam to generate electricity from the irrigation releases. Although the civil works make up the largest proportion of the capital cost of the project, the hydro mechanical equipment is vitally important to the success of the project. This paper gives a description of the hydro mechanical equipment for the project, the contractual arrangements to procure and install it, some of the important specifications used for the design and manufacture of the equipment and the quality assurance methods used to ensure that the equipment meets the long-term project requirements. Figure 1 shows the downstream view of the dam and outlet works taken from a drone.

 

Download the full technical paper.

Download

Recent Insights

September 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
September 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
September 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
September 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
September 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
August 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
July 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
July 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
June 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
June 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
June 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
May 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
April 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
November 2024
Knight Piésold: Commitment to African Excellence
November 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
November 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
November 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Grouting to Reduce Seepage at Neckartal Dam, Namibia
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine