Challenges in Classifying and Designing Spillway Upgrades for a Small Embankment Dam Upstream of an Urban Population

Challenges in Classifying and Designing Spillway Upgrades for a Small Embankment Dam Upstream of an Urban Population

Author: Katrina Wechselberger, Violeta Martin, Egbert Scherman, Alana Shewan
Conference: CDA 2018 Annual Conference
Date: October 13-18, 2018

ABSTRACT
A 10 m high embankment dam located 4 km upstream of a populated area was assessed during its Dam Safety Review as requiring an upgrade to the spillway capacity to comply the current CDA Dam Safety Guidelines and BC Dam Safety Regulations. At normal operating levels, the Dam stores approximately 31,000 m3 of water. The Dam was completed in 1966 and has been successfully operated by the Dam Owner without incident for over 50 years as a critical part of the water distribution system, specifically the diversion and intake location for the irrigation system serving the area’s rural community. Various studies were completed on the Dam to assess its compliance and classification under the new criteria.

Due to the confined valley and orientation of the spillway weir, the only feasible solution to continue the existing operation without decommissioning and replacement, was to raise the crest of the Dam in order to pass the new design flood through the existing spillway. Given the downstream permanent population, the inundation study showed areas of residential and commercial properties affected. A detailed study translating inundated areas into an estimated loss of life and economic losses followed. A discussion of the risk mitigation efforts and emergency planning that is possible with a forecasted flood induced event led to a solution that satisfied both the consequence criteria of the CDA Dam Safety Guidelines, the BC Dam Safety Regulations and the engineering design limitations for this small dam and reservoir volume.

 

Download the full technical paper.

Download

Recent Insights

February 2024
Empowerment and Resilience
January 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
January 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects
November 2023
Knight Piésold Commences with the ESIA for Haib Copper
November 2023
Insights from the Compilation and Critical Assessment of Breach and Runout Characteristics from Historical Tailings Dam Failures: Implications for Numerical Modelling
November 2023
Earthquake-induced Deformation Analysis of a TSF Undergoing Tailings Reprocessing
November 2023
Case Study: Approach to Determining the Risk Mitigation Priority of a Historic TSF in North America
October 2023
Data Management and Insights for Effective Tailings Storage Facility Management
October 2023
The Role of Sensitivity Analysis in Selecting Dam Breach Parameters
October 2023
Influence of Increased Confining Stress on Undrained Behavior of Tailings: A Case History at the Candelaria Mine
October 2023
The Re-use of Existing Bituminous Stabilised Materials for the Rehabilitation of National Route 7 - Case Study
September 2023
Transición energética para gerentes de mina
August 2023
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
July 2023
Selection of Soil Shear Strength Parameters Based on Integrated In Situ Tests, Lab Tests and Numerical Calibration Approach
June 2023
Leveraging Knowledge and Experience of a Well-Formed Independent Tailings Review Board to Enhance Tailings Facility Safety
May 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
February 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile
February 2023
Geotechnical Characterization of Collapsible Salty Sands Subjected to Monotonic and Cyclic Loadings – A Case Study for Areas with High Seismicity
November 2022
Application of the 3D Limit Equilibrium Method in Tailings Dam Breach Analysis
November 2022
Evaluation of Tailings Behaviour for Dam Breach Assessments